Regional Logistics Hub & Cold Storage Complex
AREA
21,000 m²
DURATION
14 Months
ROLE
Main Contractor
CITY
Cairo
Engineering & Construction Scope
- Fabrication and precision erection of long-span structural steel framing
- Laser screed heavy-duty industrial superflat floor casting (TR34 standard)
- Advanced PIR thermal insulated envelope for multi-temperature cold storage
- Hydraulic dock levelers, sectional doors, and automated foam fire deluge
Handover & Commissioning Checklist
- Primary EPC handover & commissioning protocol sign-off
- Cold chain thermal insulation & refrigeration integrity test report
- Official Civil Defense & Fire Life-Safety compliance certificate
- Comprehensive digital Operations & Maintenance (O&M) asset manuals