Turnkey Handed Over Regional Logistics Group

Regional Logistics Hub & Cold Storage Complex

AREA 21,000 m²
DURATION 14 Months
ROLE Main Contractor
CITY Cairo
Regional Logistics Hub & Cold Storage Complex

Engineering & Construction Scope

  • ■ Fabrication and precision erection of long-span structural steel framing
  • ■ Laser screed heavy-duty industrial superflat floor casting (TR34 standard)
  • ■ Advanced PIR thermal insulated envelope for multi-temperature cold storage
  • ■ Hydraulic dock levelers, sectional doors, and automated foam fire deluge

Handover & Commissioning Checklist

  • Primary EPC handover & commissioning protocol sign-off
  • Cold chain thermal insulation & refrigeration integrity test report
  • Official Civil Defense & Fire Life-Safety compliance certificate
  • Comprehensive digital Operations & Maintenance (O&M) asset manuals

Construction Progression: Foundation to Turnkey

Blueprint Plan
Completed Project
↔

Planning a Similar Landmark?

Our engineering staff is ready to analyze blueprints, prepare BOQs, and deliver binding turnkey proposals.

Inquire for Similar Project 💬 Instant WhatsApp Inquiry